Window Installation Process:
The following steps are taken when SonRise Windows and Coting
installs new replacement windows in your home.
1. On-Site Engineering
Our installation manager visits the home, by appointment, to make
concise measurements of the windows to be replaced. This data is
fed to state-of-the-art computers in the factory to custom build
your windows and doors.
Important: On final measure, the installation manager reviews all
aspects of products that were originally requested. If there are
any changes of customer or customer requests, they are made now
and signed off and at that time the order will be immediately submitted
for production.
2. Manufacturing
Windows are then assembled with the highest standards in the industry
to provide unequaled quality and durability.
3. Scheduling
Our installation manager sets up an installation date convenient
to you and an installation team is assigned to the job.
4. First Steps in the Home
Our installation team arrives by appointment. Drop cloths are used
so that your carpet or floor surfaces are not ruined.
5. Homeowner's Responsibilities
You should remove draperies, mini-blinds or any window treatment
prior to the arrival of technicians.
6. Removal of Old Windows
Care is taken to remove existing windows so we do not damage existing
stucco or interior wall. Old windows are not removed unless new
windows can be installed at the same time. This ensures that your
home will always remain secure.
6a. Removal of All Stops
Your window sash is held in place by exterior and interior wooden
stop strips that must be removed first.
6b. Removal of Sash & Hardware
Next the sash with the glass panes are removed along with any hardware
they came with or that remain on the window frame.
6c. Clean-up of Sub-Frame
Finally, the Sub-Frame is cleaned up, removing any obstructions
and old hardware that might still be attached to it. The old windows
and materials are then removed from the property.
7. Installation of New Window
Your new custom fit windows and doors are professional installed
by our factory-trained technicians. Installation of the trim is
the final step. Great care is taken to provide a neat, clean, and
finished appearance.
8. Insulation and Trim Wrap
Once fastened to the sub-frame, insulation is applied to the space
between the sub-frame surface and new window casing to ensure complete
weatherproofing of the window.
Optional: The exterior trim can be covered with a vinyl wrap to
match the new vinyl window. By adding this feature, the entire exterior
of window will be completely maintenance free.
9. Window Cleanup
All stickers are removed from windows and then cleaned. All old
windows and doors are removed from the job site along with excess
debris.
10. Inspection & Check-Off
The job site foreman will review installation with the homeowner.
Upon your complete satisfaction, you will be asked to sign a completion
certificate and check off sheet
|